Grindmaster P400E Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekspresy do kawy Grindmaster P400E. Grindmaster P400E User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 36
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Shuttle Brewer & Airpot/Shuttle Brewers
Operation and Instruction Manual
For Models P300E, P400E, RAP300E,
RAP400E, RAPS300E, RAPS400E
Installation:
See rough-in drawings in this manual for dimensions and locations of
electric and water input.
Set-Up/Position
1) Remove the brewer from the packing material and attach its legs.
2) Position the brewer on a strong, stable table or counter. Check the
level front to back and side to side. Adjust the legs to the correct level.
IMPORTANT:
THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE
FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS
MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC
CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL
ORDINANCES.
The electric and water hook-up locations are behind the front panel.
Remove the four screws fastening this panel for access to these
connections.
Table of Contents
Installation and Start-up ....................................... 1-2
Operation .......................................................... 3
Adjustments ........................................................ 4-7
Care and Cleaning ............................................... 8-9
Service ............................................................... 9-10
Troubleshooting
Filling Problems .................................... 11
Heating Problems ................................. 12
Brewing Problems ................................ 13
Parts Illustrations
Models P300E & P400E ....................... 14
Model RAP400E ..................................... 15
Model RAPS400E ................................... 16
VSB-400................................................ 17
Shuttle CS-LL .......................................... 18
Rough-In Drawings
Model P-300.......................................................... 19
Model P-400 ......................................... 20
Model RAP-300 ......................................... 21
Model RAP-400 ........................................ 22
Model RAPS-300 ....................................... 23
Model RAPS-400 ..................................... 24
VSB-300 .................................................. 25
VSB-400 ................................................ 26
Wiring Diagrams
P300E/P400E with 1 Batch Timer ......... 27
P300E/P400E with 2 Batch Timer........ 28
RAP300E/RAP400E................................29
RAPS300E/RAPS400E........................30
Drawing #091-548 .................................31
Drawing #091-182 ....................................32
Warranty ................................................................... 36
Water Hook-up
1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.
2) Use 3/8" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection
to the fill valve is 3/8" flare.
3) Water line pressure must be from 30 to 70 psi.
4) Hot (up to 160°F) or cold water may be used. Hot water offers faster recovery between brews.
5) Install a shut-off valve near the brewer.
6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water
has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting
type if cold water is used. Contact our parts department to select the filter for your conditions.
© Grindmaster Corporation, 1998
PRINTED IN U.S.A.
0306 FORM # AM-309-06
Part # 090-077
Prior authorization must be obtained from Grindmaster Corporation for all warranty claims.
Grindmaster Corporation
4003 Collins Lane
Louisville, KY 40245 USA
(502) 425-4776
(800) 695-4500 (USA & Canada only)
(800) 568-5715 (Technical Service Only)
FAX (502) 425-4664
www.grindmaster.com
WARNING
ELECTRIC SHOCK HAZARD!
Installation of this appliance should be performed by
qualified service personnel only. Improper installation could
result in electrocution.
Przeglądanie stron 0
1 2 3 4 5 6 ... 35 36

Podsumowanie treści

Strona 1 - RAP400E, RAPS300E, RAPS400E

Shuttle Brewer & Airpot/Shuttle BrewersOperation and Instruction ManualFor Models P300E, P400E, RAP300E,RAP400E, RAPS300E, RAPS400EInstallation:Se

Strona 2 - Installation (con't)

Page 10Service (con't)Drain Water TankAlways empty the tank before shipping.Note: Brewer may contain over 5 gallons of hot water.1) Prepare a hea

Strona 3 - Operation

Page 11Troubleshooting: Filling, Heating, and BrewingOverfilling watertank even whenpower is off.Fill valve not sealingproperly.Fill valve installedba

Strona 4 - Adjustments

Page 12Shuttle Brewers & Airpot/Shuttle BrewersIf you still need help, call our Technical Service Department at (502) 425-4776 or (800) 695-4500 (

Strona 5 - BYPASS VALVE

Page 13Troubleshooting: Filling, Heating, and BrewingBrewing ProblemsThe brewing system consists of the following components:• Start and Stop, switch

Strona 6

Page 14Parts Illustration for Models P300E & P400EShuttle Brewers & Airpot/Shuttle BrewersItem Part # Description Item Part # Description1 A54

Strona 7

Page 15Parts Illustration for Model RAP400EShuttle Brewers & Airpot/Shuttle BrewersItem Part # Description Item Part # Description1 A548-072 LEG,

Strona 8 - Cleaning

Page 16Parts Illustration for Model RAPS400EShuttle Brewers & Airpot/Shuttle BrewersFRONTItem Part # Description Item Part # Description1 A545-034

Strona 9

Page 17Shuttle Brewers & Airpot/Shuttle BrewersTOP (COVER REMOVED)FRONTFRONT (COVER REMOVED)5 4 3 2 1 1110162022 9 171918 23 15 1413128 7 6 21Part

Strona 10 - Service (con't)

Parts Illustration for Shuttle CS-LLItem Part # Description1 A537-053 FAUCET MODEL ES2 A522078SHANK W/ CHROME BONNET3 A718-018 GAUGE ASSEMBLY4 A725-

Strona 11

Page 19Shuttle Brewers & Airpot/Shuttle BrewersRough-In Drawing for Model P-300

Strona 12

Page 2Shuttle Brewers & Airpot/Shuttle BrewersInstallation (con't)Electric Hook-up1) The electric ratings for your brewer are printed on its

Strona 13

Rough-In Drawing for Model P-400 Page 20Shuttle Brewers & Airpot/Shuttle Brewers

Strona 14

Page 21Shuttle Brewers & Airpot/Shuttle BrewersRough-In Drawing for Model RAP-300

Strona 15 - SPRAY TEE KIT W/ BYPASS PLUG

Rough-In Drawing for Model RAP-400Page 22Shuttle Brewers & Airpot/Shuttle Brewers

Strona 16 - SINGLE RECEPTACLE NEMA 5-15R

Page 23Shuttle Brewers & Airpot/Shuttle BrewersRough-In Drawing for Model RAPS-300

Strona 17 - FRONT (COVER REMOVED)

Page 24Shuttle Brewers & Airpot/Shuttle BrewersRough-In Drawing for Model RAPS-400

Strona 18 - Gauge Assembly A718-018

Page 25Shuttle Brewers & Airpot/Shuttle BrewersRough-In Drawing for Model VSB-300WWWWW A TERIMS

Strona 19

Rough-In Drawing for Model VSB-400Page 26Shuttle Brewers & Airpot/Shuttle Brewers

Strona 20

Page 27Shuttle Brewers & Airpot/Shuttle BrewersWiring Diagram for P300E/P400E, with 1 Batch TimerNOTE: THIS DRAWING SHOWS COMPONENTS ONSTANDARD MO

Strona 21

Wiring Diagram for P300E/P400E, with 2 Batch TimerNOTE: THIS DRAWING SHOWS COMPONENTS ONSTANDARD MODEL ONLY. SEE 091-548 FOR WIRINGOF BREWER OPTIONSPa

Strona 22

Page 29Shuttle Brewers & Airpot/Shuttle BrewersWiring Diagram for RAP300E/400E NOTE: THIS DRAWING SHOWS COMPONENTS ONSTANDARD MODEL ONLY. SEE 091-

Strona 23

Page 3Operation1) RAPS Brewers require the accessory warmer base placed over the pegs on the brewshelf before brewing into a shuttle. Plug the base in

Strona 24

Wiring Diagram for RAPS 300/400ENOTE:1) TWO SETS OF RECEPTACLE COMPONENTS ONLYPROVIDED ON TWIN RAPS400E MODEL. DELETEGROUP IN DASHED BOX FOR RAPS300E

Strona 25

Page 31Shuttle Brewers & Airpot/Shuttle BrewersWiring Diagram #091-548NOTE:1) ONE GROUP OF WARMER COMPONENTS PERBREW HEAD ON P AND RAPS MODELS.2)

Strona 26

Wiring Diagram #091-182T3 T3 T3 1 1 T4 AT2 T3 T3 T4 T4 T4 BT2 T3 T3 1 1 T1 CT3 T3 T3 T1 T1 T4 DT2 T3 T3 T1 T1 T4 ET2 T3 T3 T1 T1 T2 FNOTE: USE WIRE NU

Strona 27 - OF BREWER OPTIONS

Page 33Shuttle Brewers & Airpot/Shuttle BrewersNotes

Strona 28

Page 34Shuttle Brewers & Airpot/Shuttle BrewersNotes

Strona 29 - Drawing #091-545

Page 35Shuttle Brewers & Airpot/Shuttle BrewersNotes

Strona 30 - Drawing #091-523

Grindmaster Corporation4003 Collins LaneLouisville, KY 40245 USA(502) 425-4776 (800) 695-4500FAX (502) 425-4664www.grindmaster.com© Grindmaster Corpo

Strona 31 - Wiring Diagram #091-548

Page 4AdjustmentsAll adjustable components are located under the top cover. To access these parts:1) Shut off the electric line to the brewer or unplu

Strona 32 - Wiring Diagram #091-182

Page 5Two Batch Timer with Knob Adjustment, See Figure 2:This timer is adjustable from 15 seconds to 5 minutes.Locate the adjustment knobs under the t

Strona 33

Page 6To Adjust the Bypass:1) Shut off and open brewer as described at the beginning of the adjustments section.2) Locate the bypass valve for the bre

Strona 34

Page 74) If the maximum temperature adjustment needs to be increased, insert a small flat screwdriverinto the shaft. Turn the calibration screw counte

Strona 35

Page 8CleaningAfter Each Brew:1) Dispose of grounds and rinse brew basket.2) Rinse shuttle or airpot containers before reuse.Every Day:1) Wash brew ba

Strona 36 - WARRANTY

Page 9Weekly or Bi-Weekly, Depending on Use1) Fill shuttles with one gallon, 2/3 full, of hot water.2) Pour into the shuttle liners the recommended co

Komentarze do niniejszej Instrukcji

Brak uwag